Building the new dairy in 2001. The steel framework was
erected by "Professionals" but we layed all the concrete floors and built all
the walls. Oh and all the plumbing. Our cheese cellar is under the floor on the
left. It's very slightly brown from the soil that was previously on top.
First |
Previous Picture |
Next Picture |
Last
